[ operations ]
Material Planner (electrical)
Crusoe- Location
- Not specified
- Work mode
- On-site
- Type
- full time
- Listed
Applications go directly to Crusoe. Ramai takes no fee for placement and no money for ranking.
[ About this role ]
The Material Planner, Electrical is responsible for ensuring the production schedule is materially feasible for electrical components. This role involves running MRP, maintaining Clear-to-Build status, managing shortages, and owning supplier forecasts and commitments, with a focus on long lead times and a concentrated supply base.
Skills and focus areas
- material planning
- electrical components
- switchgear
- pdc components
- cable and wire
- master production schedule (mps)
- manufacturing bill of materials (mbom)
- mrp logic
- bom structures
- data-driven scheduling
- supplier forecast
- shortage management
Summary written by Ramai from the original posting. Full details and requirements are on Crusoe’s careers page.
[ More at Crusoe ]
See all 355 open roles at Crusoe →[ Similar roles at other startups ]
- Implementations Configuration Specialist - CanadaAutoFi
- Virtual Medical Assistant (cst)Heartbeat Health
- Part-time Operations Analyst - Outreach & Scheduling (student Role)Clozd
- Program Manager, Bank PartnershipsCardless
- Head of It & SystemsAnine Bing
- Associate Director, Event ProductionAxios HQ
[ Not quite right? ]
Tell the assistant what you’re after — stage, location, stack, visa sponsorship — and it searches every open role for you. A few questions are free, no account needed.